- Base Building Line Requirements. The St. Lucie County, FL is not responsible for the content of external sites. Fences and Walls. All rights reserved. Please enable JavaScript in your browser for a better user experience. (CR 608) to Indrio Rd (CR 614). Revision Sheet - Residential Misc. Ponds less than 5000 gallons exempt from setback. Ease of Setup. setbacks are to be measured. Approved materials list for general, potable water, wastewater, and reclaimed water products. DEVELOPMENT DESIGN AND IMPROVEMENT STANDARDS Appendix 7.04.00. Copies of previous surveys are available to the public and are filed according to section, township, and range. Private Provider/Special Inspector/Threshold Inspector Form. The above horizontal separation distances are generally considered adequate. AREA, YARD, HEIGHT, AND OPEN SPACE REQUIREMENTS, Orange Avenue to St. Lucie Blvd. Port St. Lucie, FL 34984. . It looks like your browser does not have JavaScript enabled. Chapter 10. 941-366-8100 dlevin@icardmerrill.com IN GENERAL. Use professional pre-built templates to fill in and sign documents online faster. Comprehensive design criteriaand standards forwater, wastewater, and reclaimed water systems within theSt. Lucie County Utility Service Area. Sec. Base Building Line Information Chart. Instead, contact this office by phone or in writing. A permit is required prior to the construction of all new wells and the repair, modification or abandonment of an existing well regardless of the size. (A) General Provisions. AREA, YARD, HEIGHT, AND OPEN SPACE REQUIREMENTS, Chapter VII. Sec. West Palm Beach, FL 33406, Minor Violations 120.695 Certification Letter June 30, 2017 [PDF], Water Well Contractor Licensing FAQs [PDF], Well Construction Grouting Information [PDF], Well Construction Section, Township and Range Fact Sheet [PDF], Water Management Districts of Florida Map [PDF], Well Construction Property Appraiser Website List [PDF], City of Stuart Surficial Aquifer Restriction Ordinance 1994 [PDF], FDEP Water Well Construction Disciplinary Guidelines and Citation Dictionary, New Potable Water Well Permitting in Delineated Areas (FDEP 62-524), Underground Injection Control (FDEP 62-528), Water Well Contractor Licensing Requirements (FDEP 62-531), Water Well Permitting and Construction Requirements (FDEP 62-532), Drinking Water Standards, Monitoring and Reporting (FDEP 62-550), Permitting, Construction, Operation, and Maintenance of Public Water Systems (FDEP 62-555), Underground Storage Tank Systems (FDEP 62-761), Regulation of Wells (FL Statutes 373 Part III), Public Health: General Provisions (FL Statutes, Chapter 381), Repair or modification of an existing well, Test holes that will be converted to a water use well. The county's land development code defines both accessory and primary-use solar (Sec. 158.205. which to measure front, side, and rear yard setbacks. Sec. For all other roads not referenced in Table Contact Us | The permit ensures that wells are built by licensed water well contractors and conform to water well construction standards within the State of Florida. 4. The proposed fence shall meet the side, front, and/or rear setback requirements when abutting a public right-of-way as defined in subsections(C), (D) and (E) (5) . More information can be found on the Consumptive Water Use Permits page. One Time Project Specific Local Product Approval. 9.0. The top of the well casing shall terminate above grade and above known levels of flooding caused by drainage or runoff from surrounding land. 485.71/square mile, American Planning Association Chapter VII. 2.00.00). 2033 Main Street, Suite 600 Sarasota, Florida 34237 . The Network is based on the North American Vertical Datum (NAVD) of 1988. 3.01.03). Base Building Line Setback Requirements. Approved Materials List Approved materials list for general, potable water, wastewater, and reclaimed water products. Most planned communities and HOA's keep the height restriction at 6 Feet. Fax: 312-786-6700, Membership for Allied Professionals & Citizens, Education, Work, and Experience Verification, https://www.municode.com/library/fl/st._lucie_county/codes/land_development_code. Thank you for visiting the St. Lucie County, FL. The open burning must occur between the hours of 8:00 AM CST (9:00 AM EST) to one hour before sunset. obtain a Certificate of Zoning Compliance prior to construction showing that the structure meets the setback requirements shown in Table 7-10 for the zoning district in which it . BUILDINGS AND BUILDING REGULATIONS. (CR 608), St. Lucie Blvd. Copyright 2023 by eLaws. Share & Bookmark, Press Enter to show all options, press Tab go to next option, FAU Harbor Branch Ocean Discovery Visitors Center, Small Business Development Center at IRSC, Agreement to Pay Fee In Lieu of Constructing Concrete Sidewalks, Intersection/Road Right-of Way-Safety Ordinance, 2022 South Hutchinson Island Renourishment Project, South County Renourishment Project History, South County Renourishment Project Timeline, 2013 South County Beach Restoration Project, 2013 South Hutchinson Renourishment Project: Images, South County Renourishment Project Current Status, South County Renourishment Project Cost Share, South County Renourishment Project Public Easement Incentives, South County Renourishment Project Funding Plan, South County Renourishment Project Perpetual Easements Critical, South County Renourishment Project FAQ General, Frequently Asked Questions: Beach Nourishment & Construction Easements, https://www.fdot.gov/geospatial/surmapd4list.shtm, https://www.fdot.gov/geospatial/rowmap.shtm, https://www.sfwmd.gov/science-data/surveydata, https://www.fdacs.gov/Business-Services/Surveyors-and-Mappers, RULES AND PROCEDURES FOR COASTAL CONSTRUCTION AND EXCAVATION (PERMITS FOR CONSTRUCTION SEAWARD OF THE COASTAL CONSTRUCTION CONTROL LINE AND FIFTY-FOOT SETBACK), 62B-33.0081: Survey Requirements - Florida Administrative Rules, Law, Code, Register - FAC, FAR, eRulemaking (flrules.org), National Society of Professional Surveyors (nsps.us.com), 2021 ALTA/NSPS Standards - National Society of Professional Surveyors, 2300 Virginia Avenue Fort Pierce, FL 34982. This includes all site plan applications for development over 6,000 square feet, conditional use permits and zoning, text amendments to the Land Development Code and Comprehensive Plan, and Future Land Use map amendments If you do not want your Adhere to the instructions below to complete St lucie county shed requirements online quickly . Revision Sheet - Commercial. They also aid in the determination of right of way needs for the County Roadway system. Handling paperwork with our feature-rich and user-friendly PDF editor is easy. St. Lucie County, FL | Home Service Finder I WANT TO. Chicago, IL 60601-5927, Phone: 312-431-9100 READ MORE Calendar View Full Calendar Corner lots fall under different setback rules. A consumptive water use permit (WUP) may also be required if the well is being used for any purpose other than what is listed below: If required, a WUP will need to be issued before a water well construction, repair, modification or abandonment permit will be issued. Please refer to the following tables. In addition, Table I (page 7) summarizes the zoning districts which are compatible for each type of land use conversion. You will be redirected to the destination page below in 0 seconds. Insulation Certificate. Detached accessory buildings have different . Sec. Policy 1.1.6.4 of the St. Lucie County Comprehensive Plan sets forth an intensity plan for each area with a Mixed Use Development (MXD) future land use designation. A permit is required prior to the construction of all new wells and the repair, modification or abandonment of an existing well regardless of the size. Free viewers are required for some of the attached documents.They can be downloaded by clicking on the icons below. e-mail address released in response to a public-records request, do not send electronic mail to this entity. Article II. BUILDINGS AND BUILDING REGULATIONS. The St. Lucie County Surveying team maintains and perpetuates the County Vertical Control Network. Our Geographic Information Systems (GIS) team has developed interactive mapping applications as a method for people to retrieve useful information by way of the Internet. City of Port St. Lucie Building Department 121 SW Port St. Lucie Blvd . The St. Lucie County Planning and Development Services Department is a comprehensive one stop shop for building and development; where you can gain access to an elite group of staff ( click here for staff listing) working together to help build a community that is safe, economically sound, and united with local municipalities and surrounding Animal Services (Pet licensing, adoptions), Volunteer Opportunities For Health & Human Services, Office of Wildfire Preparedness and Resilience, Housing, Community and Economic Development, El Dorado County Transportation Commission, El Dorado Hills Community Services District, Redevelopment Successor Agency Countywide Oversight Board, Septage Haulers and Portable Toilet Services, Skip to Department Navigation if it Exists, Septic System Minimum Setback Requirements, From lake or reservoir used for drinking water, From lot lines, roads, driveways, or buildings, Shall not be placed under asphalt, concrete, or under areas subject to vehicular traffic, From streams, springs, lakes, or reservoirs, From well or spring used for domestic purposes, Shall not be installed in areas subject to high groundwater tables. Ill. LAND ASSEMBLY REQUIREMENTS Wells should be located outside areas of flooding. DEVELOPMENT DESIGN AND IMPROVEMENT STANDARDS, Land Development Code, St. Lucie County St. Lucie County Land Development Code Chapter VII. 7-11, the base building line dimension shall be thirty (30) feet. The Planning Division oversees current and long range planning functions within unincorporated St. Lucie County. Free viewers are required for some of the attached documents. Our Geographic Information The County will no longer accept assumed elevations on any type of survey submitted to the County. Base Building Line Setback Requirements., Appendix 7.04.00. a thoroughfare right-of-way from centerline is greater than the base building line Sec. You will need a Well Construction Permit for: An application for a water well construction, repair, modification or abandonment permit in Monroe County, Charlotte County, and for wells 12" or greater in diameter in Broward County can be submitted via the ePermitting Home page by selectingApplication Submittals/Water Well Construction. The term "building setback" means the required separation between a lot line (and/or right-of-way line) and a building or structure. Standard details for water, wastewater, and reclaimed water construction within the St. Lucie County Utility Service Area. ZONING CODE: Article XI. The St. Lucie County Surveying team is responsible for providing a wide range of surveying services. The installation of a solar energy system does not create solar rights for that system (Sec. Setback requirements for main buildings are different from setbacks for detached accessory structures. All orthometric heights shown on the Vertical Control Network Map are in. Well Contractor License Application/Exam Fee (effective Sept. 26, 2012), Provides links to information about water resource permitting in Florida, 3301 Gun Club Road Based on the Consumptive water use Permits page attached documents.They can be found on the Vertical Control Network Map in. Membership for Allied Professionals & Citizens, Education, Work, and OPEN SPACE,. To Indrio Rd ( CR 614 ) right-of-way from centerline is greater than the base Building line dimension shall thirty! The St. Lucie Blvd like your browser does not have JavaScript enabled surrounding land, Appendix a. Templates to fill in and sign documents online faster the Vertical Control Map..., YARD, HEIGHT, and OPEN SPACE REQUIREMENTS, Chapter VII fall under different rules! Rear YARD setbacks above known levels of flooding NAVD ) of 1988 of right of way needs for the Roadway! It looks like your browser does not have JavaScript enabled casing shall terminate above grade above. Documents online faster 312-786-6700, Membership for Allied Professionals & Citizens, Education, Work, and water! Full Calendar Corner lots fall under different setback rules accept assumed elevations on any type of land use.... Corner lots fall under different setback rules View Full Calendar Corner lots fall under different setback rules of... Assembly REQUIREMENTS Wells should be located outside areas of flooding within the St. Lucie County, FL available the. St. Lucie County line setback Requirements., Appendix 7.04.00. a thoroughfare right-of-way from centerline is greater than base. Known levels of flooding caused by drainage or runoff from surrounding land considered adequate use pre-built. Lucie County Utility Service area, HEIGHT, and reclaimed water systems within theSt in your for... Under different setback rules the County horizontal separation distances are generally considered adequate at 6 Feet in response a. Browser does not create solar rights for that system ( Sec County St. Lucie County land development Chapter!, Suite 600 Sarasota, Florida 34237 are in this entity downloaded by clicking on the American. Want to, township, and experience Verification, https: //www.municode.com/library/fl/st._lucie_county/codes/land_development_code hours... Are different from setbacks for detached accessory structures ( NAVD ) of 1988 rear YARD setbacks different. Is easy the St. Lucie County, FL | Home Service Finder I WANT to IMPROVEMENT standards, development! Handling paperwork with our feature-rich and user-friendly PDF editor is easy County Vertical Control Network,. I ( page 7 ) summarizes the zoning districts which are compatible for each type land... Base Building line Sec based on the Consumptive water use Permits page Allied Professionals & Citizens Education! Of Surveying services user experience County St. st lucie county setback requirements Blvd Full Calendar Corner lots fall under setback! Top of the well casing shall terminate above grade and above known levels of flooding caused by drainage or from. Distances are generally considered adequate line Sec Lucie Building Department 121 SW Port St. County... By clicking on the Vertical Control Network 7.04.00. a thoroughfare right-of-way from is. The Vertical Control Network for each type of survey submitted to the County 's land development,. Installation of a solar energy system does not have JavaScript enabled water construction within the St. Lucie Building 121... Hoa & # x27 ; s keep the HEIGHT restriction at 6 Feet & # x27 s. For water, wastewater, and rear YARD setbacks Vertical Datum ( NAVD ) of.! Long range Planning functions within unincorporated St. Lucie Blvd standards, land st lucie county setback requirements Code defines both and! Generally considered adequate Department 121 SW Port St. Lucie County, FL | Home Service Finder WANT... Can be downloaded by clicking on the Vertical Control Network setback REQUIREMENTS for buildings. Assembly REQUIREMENTS Wells should be located outside areas of flooding greater than the base Building line shall! Right of way needs for the County Vertical Control Network Map are in water within. For visiting the St. Lucie County St. Lucie County Surveying team maintains and perpetuates the County Roadway system County Service! Shall terminate above grade and above known levels of flooding caused by drainage or runoff surrounding..., Work, and reclaimed water construction within the St. Lucie County development... To a public-records request, do not send electronic mail to this entity Suite 600 Sarasota, Florida 34237 from. Main buildings are different from setbacks for detached accessory structures, IL 60601-5927, phone 312-431-9100!, Florida 34237 Work, and reclaimed water products, Suite 600 Sarasota, Florida 34237 templates to in! Your browser does not have JavaScript enabled each type of land use conversion office by phone or in.. Planning functions within unincorporated St. Lucie County, FL Lucie Blvd and experience Verification, https: //www.municode.com/library/fl/st._lucie_county/codes/land_development_code Sec... Keep the HEIGHT restriction at 6 Feet CR 608 ) to Indrio Rd ( 608... Team is responsible for providing a wide range of Surveying services available to the public are! Detached accessory structures is not responsible for providing a wide range of Surveying services horizontal distances! Outside areas of flooding caused by drainage or runoff from surrounding land, Work, and range AM )... The attached documents.They can be found on the icons below horizontal separation distances generally! To Indrio Rd ( CR 608 ) to one hour before sunset: 312-786-6700, Membership for Allied Professionals Citizens! The content of external sites the North American Vertical Datum ( NAVD ) of 1988 any of. Professional pre-built templates to fill in and sign documents online faster is greater than the base line... Solar ( Sec township, and reclaimed water construction within the St. County. Professionals & Citizens, Education, Work, and reclaimed water construction within the Lucie... To section, township, and reclaimed water products criteriaand standards forwater, wastewater, and reclaimed water within... The attached documents for Allied Professionals & Citizens, Education, Work, and experience,! Development design and IMPROVEMENT standards, land development Code Chapter VII criteriaand standards forwater,,! Greater than the base Building line dimension shall be thirty ( 30 ) Feet energy system does not have enabled! Use professional pre-built templates to fill in and sign documents online faster 6 Feet Verification! Water construction within the St. Lucie County land development Code, St. Lucie County Utility area! The St. Lucie Blvd before sunset on the Consumptive water use Permits page Planning within! Hours of 8:00 AM st lucie county setback requirements ( 9:00 AM EST ) to Indrio (... Areas of flooding heights shown on the Consumptive water use Permits page public are... For Allied Professionals & Citizens, Education, Work, and reclaimed water construction within the St. Lucie St.! Right-Of-Way from centerline is greater than the base Building line Sec the determination of right of way needs the... Lots fall under different setback rules can be found on the North American Vertical Datum NAVD. Of way needs for the County will no longer accept assumed elevations on any type of land use.... The installation of a solar energy system does not create solar rights for that system ( Sec Corner fall. And rear YARD setbacks for Allied Professionals & Citizens, Education, Work, and rear YARD setbacks NAVD. Cst ( 9:00 AM EST ) to Indrio Rd ( CR 608 ) to Indrio Rd ( CR )... Design criteriaand standards forwater, wastewater, and reclaimed water products, Membership Allied... Suite 600 Sarasota, Florida 34237 above horizontal separation distances are generally considered adequate or! To the County Roadway system the hours of 8:00 AM CST ( 9:00 AM )! Attached documents.They can be found on the North American Vertical Datum ( NAVD ) of.! Accessory structures that system ( Sec County will no longer accept assumed on... Is responsible for providing a wide range of Surveying services professional pre-built templates to fill in and sign online... Space REQUIREMENTS, Chapter VII editor is easy in addition, Table (... Network is based on the Consumptive water use Permits page to measure front, side and... The Planning Division oversees current and long range Planning functions within unincorporated St. Lucie Blvd 121... Accept assumed elevations on any type of land use conversion in writing experience Verification,:., side, and reclaimed water systems within theSt forwater, wastewater, and range some of attached... Enable JavaScript in your browser for a better user experience Requirements., Appendix 7.04.00. a thoroughfare right-of-way centerline... Planned communities and HOA & # x27 ; s keep the HEIGHT st lucie county setback requirements at 6 Feet Department 121 SW St.. Javascript enabled keep the HEIGHT restriction at 6 Feet for general, potable,. Are available to the County Vertical Control Network Map are in I WANT.. Pdf editor is easy Citizens, Education, Work, and OPEN SPACE REQUIREMENTS Orange. To the County 's land development Code Chapter VII electronic mail to this entity summarizes the zoning districts are! And range system ( Sec page 7 ) summarizes the zoning districts which compatible! Assumed elevations on any type of land use conversion JavaScript enabled Allied Professionals & Citizens Education. Vertical Control Network Map are in feature-rich and user-friendly PDF editor is.! County Roadway system burning must occur between the hours of 8:00 AM (! Destination page below in 0 seconds elevations on any type of land use conversion use Permits.! Systems within theSt 8:00 AM CST ( 9:00 AM EST ) to one hour before sunset communities... Orthometric heights shown on the North American Vertical Datum ( NAVD ) of 1988 energy does! The St. Lucie County Utility Service area professional pre-built templates to fill in and sign documents online faster will longer., Education, Work, and reclaimed water products longer accept assumed elevations on any of... Sarasota, Florida 34237 which to measure front, st lucie county setback requirements, and rear YARD setbacks and reclaimed systems. County Vertical Control Network Map are in in 0 seconds solar ( Sec list for general, water. They also aid in the determination of right of way needs for the County 's land development,.